Nigeria's data centre capacity is set to surge from roughly 70 MW today to over 400 MW by 2030. Global players are piling in. The 2Africa subsea cable now forms a 45,000 km ring around Africa with a design capacity of up to 180 terabits per second. Google's Equiano delivers another 144 Tbps through Lagos. We have world-class pipes. We are building world-class data halls.
We are powering them with diesel. And that single fact will determine whether Nigeria becomes an AI economy or merely an AI tenant.
Here is what nobody is discussing: eve
