Mikano International Limited, Nigeria’s Leading Power Solution provider today, has recently installed and commissioned an Independent Power Plant (IPP) of 4 Megawatts Capacity at The Intercontinental Hotel, Victoria Island Lagos; delivering 24/7 power supply to the customer at Per Kilowatts/hour efficient costing.

This Turnkey project is powered by the cutting edge German MTU Onsite Energy Gas Engine technology which offers combined heat, power and cooling solutions (CHPC) to generate power at highest performance levels with the lowest emissions possible.

The power generated was Stepped Up to 33KV by means of Medium Voltage Transformers and 33KV Switchgear, which were all provided and installed by Mikano from Start to Finish. The Main Fuel Source used in this Project is Compressed Natural Gas (CNG) due to challenges faced as a result of the unavailability of the gas pipeline in that area, reiterating the brand’s commitment to providing its clients with various operational solutions.

Despite this groundbreaking feat, Mikano is still currently involved in the management of several similar projects across Nigeria across large residential utilities, public buildings, industries and manufacturing facilities. The brand is unrelenting in its mission to be recognized as the leading solution provider and a preferred partner in the electrical, mechanical, steel fabrication and general civil works in Africa and beyond.

Power generation and solution is at the core of what the brand does.

For more information, visit: www.mikano-intl.com.

 

 

Nigeria's leading finance and market intelligence news report. Also home to expert opinion and commentary on politics, sports, lifestyle, and more

Join BusinessDay whatsapp Channel, to stay up to date

Open In Whatsapp