Mainstream Energy takes over $1.3bn Zungeru Power Plant
The federal government has handed over the $1.3 billion Zungeru Power Plant to Mainstream Energy Solutions Limited (MESL). Zungeru, which...
The federal government has handed over the $1.3 billion Zungeru Power Plant to Mainstream Energy Solutions Limited (MESL). Zungeru, which...
At the recent Budget hearing in the National Assembly, the faltering performance of Abubakar Aliyu, the Minister of Power showed...
The present insufficient power supply which has been slowing down industrial development in Nigeria will soon be a thing of...